Apr 23 2007 The study concluded that the most feasible strategy would be to increase mining capacity to 3 Mty of ore and construct a new onsite processing plant with the same capacity Following the Scoping Study the company commissioned Outokumpu to prepare a preengineering study comparable in terms of accuracy to a prefeasibility study of the new processing plant